Measure X Funds Increased Road Repairs

0
397

Avoiding potholes is on everyone’s mind with the increased rain opening them up at an unprecedented rate this winter. Public Works crews are out daily filling them (please report potholes via the City app!).

On dry days, the City’s Engineering Division is overseeing slurry seals and overlays (including new high-speed fiber optic) in areas throughout the City, including the construction of new ADA sidewalk ramps. See current work areas below. Plans are being made to repair higher-use arterial roads in the next round.